2005 Camp Randall Renovation Goals

Transform the fourth oldest college football stadium in the country into a safe, accessible and technologically advanced facility with increased capacity, an intimidating game day atmosphere, and improved customer services within the project budget.

Overall improvements:

  • All existing stadium problems/deficiencies were addressed including safety, customer service, accessibility, capacity and infrastructure.
  • Total seating capacity increased from 76,746 to 80,321.
  • Total square footage increased to 319,000-square feet, including 84,540-square feet that underwent renovation.
  • Restroom capacity was increased for women, from 212 to 463 fixtures, and increased for men, from 445 to 499 fixtures.
  • Accessible ADA seating sightlines were improved, and seating increased from 99 to 292.
  • Concession points of sale were increased from 135 to 157.
  • A pedestrian ramp and seven elevators were added. A wide third level concourse was created that encompasses half the stadium connecting the east and west sides.

Other improvements:

  • Expanded and rebuilt eastside concourses on the ground level and third floor; built new fifth-level concourse; increased restrooms, concessions
  • Built 72 suites (capacity 20); 337 premium club seats, centered on 50-yard line on the eighth (top) level; and two levels of 295 club seats (590 total) between the east stadium and Shell
  • Closed in the southeast and southwest corners with new seating, and rebuilt the south end-zone seats, increasing south end-zone capacity by 4,432 seats
  • Constructed a four-story office building to house all coaches, support staff and administration displaced by expanding east concourse
  • Added access points from behind the seating bowl and allow only players on the field no ground-level track access
  • Eliminated lowest five rows of obstructed view seats
  • Expanded westside concourses to the sidewalk, adding more circulation space, concession stands and restrooms
  • Added a scoreboard, sound system and permanent lights for night games
  • Built an Athletic Operations Building/loading dock west of the UW Field House

Schedule

Phase 0 - December 2001 to August 2002

   1. Athletic Operations Building
   2. Site utilities - new storm, water, sanitary and power

Phase 1 - December 2002 to August 2004

   1. Eastside superstructure - Camp Randall Suites, Varsity Club, Buckingham Club
   2. Athletic office building- Kellner Hall
   3. South end zone - visiting team locker room, media room
   4. Field replacement - FieldTurf on playing surface and McClain Facility
   5. Scoreboard replacement
   6. New stadium sound system
   7. Women's hockey rink replacement (in Shell)
   8. Stadium waterproofing and concrete restoration sections Q-X
   9. Eastside permanent field lights

Phase 2 - August 2004 to August 2005

   1. Remodel Westside level 3 concourse - Breese Terrace
   2. Remodel Westside press box;
          Level 9: coaches, athletic department, Wisconsin club
          Level 8: media level
          Level 7: New radio and TV broadcast booths
   3. Remodel north end level 3 concourse
   4. Remodel eastside level 3 concourse
   5. Remodel eastside level 1 concourse - Badger Alley and team dining area
   6. Site work - new gates 1 to 10
   7. Stadium bowl remodel - back loading of stadium and balance of field replacement
   8. Stadium waterproofing and concrete restoration sections M-P
   9. Westside permanent field lights
  10. Bucky's Locker Room retail store - level 1 Kellner Hall