Upgrades continue at Camp Randall

| No TrackBacks
_MG_0434_sm.jpgWhen the strikingly bright new FieldTurf was installed in early June, it signaled just the first stage of cosmetic and functional upgrades happening to Camp Randall Stadium this summer.

The next phase, which is currently underway, includes installation of LED ribbon boards on both the East and West facades as well as in the Southeast and Southwest corners above the tunnel entrances.

According to Associate Athletic Director for External Relations Justin Doherty, the digital boards will be used in a similar fashion to Kohl Center, providing information to spectators as well as new display opportunities for sponsors.

With the LED board consuming much of the west facade, the lettering which used to reside in that location needed a new home. A move to the east side of the stadium is part of a larger project to honor Wisconsin's football legacy. In addition to saying "Camp Randall Stadium," the East fascia will now feature commemorate the Badgers':

  • 6 retired names and numbers
  • 13 Big Ten Championship seasons
  • 8 Rose Bowl appearances

"We have a strong football tradition at Wisconsin and prior to this summer's project, you could walk into Camp Randall Stadium and not know if we have ever won anything. If we've ever won a championship or been in the Rose Bowl," Doherty explained. "Particularly with winning the Big Ten championship in the last two years, we felt this was a great way to celebrate and honor those achievements."

Application is scheduled to be finished in time for the opening of football practice in August.

Additionally, as part of the Student Athlete Performance Center project at the north end of Camp Randall, both of the stadium's scoreboards are scheduled to be replaced prior to the start of the 2013 season.

No TrackBacks

TrackBack URL: http://cstv.collegesports.com/mt5.2/mt-tb.cgi/35770

ON WISCONSIN